Process
1.Mark the exact position and dimensions of each footing based on the construction plan.
2.Excavate trenches to the required depth, reaching stable soil layers.
3.Install formwork and reinforcement bars according to structural specifications.
4.Pour concrete in one go to ensure solid compaction and level surface.
5.Cure the concrete for 7-14 days before removing the formwork when strength is achieved.