仓库及混凝土地坪打桩工程

描述

The Problem

When soil conditions cannot support heavy industrial floors, slab-on-grade construction alone is not sufficient. Settlement and uneven floors often appear months or years after construction.

Common Failures & Industry Observations

  • On soft or reclaimed ground,over 60% of slab-on-grade floorsexperience measurable settlement over time.
  • Floors rebuilt without piling on weak soil show ahigh recurrence of settlement within 3–5 years.
  • Differential settlement as small as10–15 mmcan affect racking alignment and machine performance.

Why Piling is Necessary

Concrete strength does not compensate for weak ground. Without transferring loads to stable soil layers, settlement will continue regardless of slab thickness.

Our Services & How We Solve It

We provide piling and piled slab solutions specifically for industrial floors:
  • Piled slab systems for full floor support
  • Hybrid piling under racking aisles or machinery zones
  • Settlement control for heavy-load floors
  • Integration with reinforced concrete slab design

This approach eliminates long-term settlement risk and maintains floor levelness.


发送您的询问至 Whatsapp

发送您的询问至 电邮

如何加入Homebagus?

立即入驻,提升生意增长!